Conqueror International | January 2012 |

CanForm Structures Ltd undertook this build for the Bill’s Family Trust.

These two buildings have a combined floor area of 6530m2.  The larger of the two, factory 1 houses  a floor area of 3770m2 and is a state of the art purpose built factory for the purpose of making PIR panel.

The factory layout and the machinery within in it required 260m of trough ducts, as well as pits and rails to be installed in situ as part of the 360mm thick floor area.This factory has a service area that houses pressurised chemicals that enter the main factory through a specialised insitu water proof concrete duct.

CanForm also managed all complex issues around earth contamination (as the previous use for this block of land was a saw mill and timber treatment plant), earth works as well as scheduling steel erection, gantry crane installation and engineers as well as local authority inspections .